Project:Thomson Residence No: 1205
LATEST UPDATE:
Building Permit Drawings

Drawing Updates and Revisions
Window and Door Schedules 2012-10-13
Curtain Wall Schedule 2012-10-14
General Revision (drawing set) 2012-10-16
part1 - part 2 - part 3 - part 4
Window and Door Revision, Fireplace, Exterior stair 2012-10-30
Curtain Wall Schedule 2012-10-14
General Revision (drawing set) 2012-10-16
part1 - part 2 - part 3 - part 4
Window and Door Revision, Fireplace, Exterior stair 2012-10-30
Building finishes, materials, specs
Stone veneer -
http://www.stoneyard.com/stone-products/veneer/vineyard-granite-mosaic/
Aluminum Cladding panels -
http://northclad.com/products/al/details/
Cloplay Garage Doors 903 -
http://www.clopaydoor.com/publicfiles/CMDC-902-903-09.pdf
Fleetwood Sliding Doors - Norwood 3070CR
http://www.fleetwoodusa.net/menu_bar/Products/3070-CR/sliding-door-norwood-3070CR.php
Fleetwood Swing Doors - Atlantic 3900
http://www.fleetwoodusa.net/menu_bar/Products/3900/hinge-thermal-door-atlantic-3900.php
Fleetwood Windows - Everest 850
http://www.fleetwoodusa.net/menu_bar/Products/850/casement-window-everest-850.php
Fleetwood Curtainwall - Kona 3800
http://www.fleetwoodusa.net/menu_bar/Products/3800/window-wall-kona-3800.php
Advantage Lumber Rainscreen IPE Siding
http://advantagelumber.com/rainscreensiding/
Delta Moisture Protection Systems
www.cosella-dorken.com/bvf-ca-en/products/foundation_residential/dimplesheets/products/ms-clear.php
Interlock Metal Roof System
http://www.vancouverislandroofing.com/metal-roofing/standing-seam-roofing
Ultratouch Denim Insulation
http://www.bondedlogic.com/construction-products/ultratouch-denim-insulation
Seamless Box Gutter
http://adpinj.com/seamless_7_box_gutter__accessories
http://www.stoneyard.com/stone-products/veneer/vineyard-granite-mosaic/
Aluminum Cladding panels -
http://northclad.com/products/al/details/
Cloplay Garage Doors 903 -
http://www.clopaydoor.com/publicfiles/CMDC-902-903-09.pdf
Fleetwood Sliding Doors - Norwood 3070CR
http://www.fleetwoodusa.net/menu_bar/Products/3070-CR/sliding-door-norwood-3070CR.php
Fleetwood Swing Doors - Atlantic 3900
http://www.fleetwoodusa.net/menu_bar/Products/3900/hinge-thermal-door-atlantic-3900.php
Fleetwood Windows - Everest 850
http://www.fleetwoodusa.net/menu_bar/Products/850/casement-window-everest-850.php
Fleetwood Curtainwall - Kona 3800
http://www.fleetwoodusa.net/menu_bar/Products/3800/window-wall-kona-3800.php
Advantage Lumber Rainscreen IPE Siding
http://advantagelumber.com/rainscreensiding/
Delta Moisture Protection Systems
www.cosella-dorken.com/bvf-ca-en/products/foundation_residential/dimplesheets/products/ms-clear.php
Interlock Metal Roof System
http://www.vancouverislandroofing.com/metal-roofing/standing-seam-roofing
Ultratouch Denim Insulation
http://www.bondedlogic.com/construction-products/ultratouch-denim-insulation
Seamless Box Gutter
http://adpinj.com/seamless_7_box_gutter__accessories
Building Design Renderings

Building Renderings - click image to enlarge
Site
2012-09-24
Site Inspection of Setting Out & Excavation.
Present PM, RF, Site staff x2, Milner Excavator
Photos and architectural clarification below
Site Inspection of Setting Out & Excavation.
Present PM, RF, Site staff x2, Milner Excavator
Photos and architectural clarification below
2012-09-27
Site Inspection + Structural Inspection of Footings / Excavation.
Present KT, PM, RC, RF, Site staff x2
Photos and structural instructions below
2012-10-05
Site Inspection + Structural Inspection of Foundation Walls & levels
RF, Site staff (Chris & Erin) x2
Photos below
RF, Site staff (Chris & Erin) x2
Photos below
2012-10-16
Site Inspection Foundation Walls & levels
Present PM, RF, Site staff (Chris & Erin) x4, electrician
Items Discussed:
1. W14 dimensions - 2'6"h x 5'0"w (can be enlarged to 4' h) - sill will be framed at 44" aff to allow for higher window if desired.
2. RC Wall adjacent to W14 - Chris enquired to height at which RC wall stops. RF recommended that it go to u/s of sole plate for shear wall connection. Confirm with Bayview Engineering if modified.
3. Chris & Erin (C/E) enquired to whether D13 would remain as drawn. RF to confirm with owner. (Note owner will confirm during site visit Thursday).
4. C/E and RF discussed floor hieghts of lower slab. 304' confirmed as finished floor height.
5. C/E enquired about exterior stair detail / connections to exterior wall. Exterior wall at C4-C5 will be revised to wall type J (cold wall) to accomodate structural support for exterior stair. This will effectively make wall on C3-C5 and C3-D3 any extra 4" thick and require that D12 move 4" over. RF to issue revised detail.
6. C/E enquired about rise/run of exterior stair. RF noted that it is shown as 6.86rise over 14risers but will issue confirmation of details.
7. C/E enquired about location of exterior stair at fireplace. It was agreed to shift the stair to center of back of stone wall to allow for cold wall details (wall type J) to not affect interior.
8. C/E enquired about interior stair rise run details. It was agreed that a rise of 6 13/16" over 18R would be used and that the Living Room floor level would be revised to -27 1/4" below 314'. RF to issue revisions on this and check stair detail.
Photos below
Present PM, RF, Site staff (Chris & Erin) x4, electrician
Items Discussed:
1. W14 dimensions - 2'6"h x 5'0"w (can be enlarged to 4' h) - sill will be framed at 44" aff to allow for higher window if desired.
2. RC Wall adjacent to W14 - Chris enquired to height at which RC wall stops. RF recommended that it go to u/s of sole plate for shear wall connection. Confirm with Bayview Engineering if modified.
3. Chris & Erin (C/E) enquired to whether D13 would remain as drawn. RF to confirm with owner. (Note owner will confirm during site visit Thursday).
4. C/E and RF discussed floor hieghts of lower slab. 304' confirmed as finished floor height.
5. C/E enquired about exterior stair detail / connections to exterior wall. Exterior wall at C4-C5 will be revised to wall type J (cold wall) to accomodate structural support for exterior stair. This will effectively make wall on C3-C5 and C3-D3 any extra 4" thick and require that D12 move 4" over. RF to issue revised detail.
6. C/E enquired about rise/run of exterior stair. RF noted that it is shown as 6.86rise over 14risers but will issue confirmation of details.
7. C/E enquired about location of exterior stair at fireplace. It was agreed to shift the stair to center of back of stone wall to allow for cold wall details (wall type J) to not affect interior.
8. C/E enquired about interior stair rise run details. It was agreed that a rise of 6 13/16" over 18R would be used and that the Living Room floor level would be revised to -27 1/4" below 314'. RF to issue revisions on this and check stair detail.
Photos below